Midwestern Developer Recovery in 2021

🏗️ Case Study: $110,000 Recovered for Midwestern Developer in 60 Days

Commercial construction site in the Midwest

A mid-sized regional developer specializing in residential and commercial construction was unaware that $110,000 in unused municipal bond deposits from a 2014 project were still being held by a Midwestern jurisdiction. Asset Management Consultants (AMC) discovered the outstanding funds and proactively reached out to alert the client.

Initial outreach was met with skepticism. The client questioned the legitimacy of the opportunity and was hesitant to engage. However, after several rounds of communication and verification, AMC secured an executed contract in late 2021—and immediately went to work.

💰 $110,000 Identified
Unused municipal funds from 2014 project
📍 Midwest Project
Residential + commercial mixed-use development
⏳ Skeptical Client
Initial doubts overcome through transparency and proof
✅ 100% Recovered
All funds returned in under 2 months

In less than 60 days after contract execution, AMC recovered the full amount and returned it directly to the client—proving not only the validity of our findings, but the value of trusting a specialized recovery partner.

📅 Case Closed: 2022 · 🏷️ Case Study